Manufacturers of pre-cast concrete parts are often faced with the problem of how to offer cost-effective production even for small volumes of concrete. This is an issue, for example, in the production of precast parts for shafts for rainwater and sewage drain systems. The pre-cast concrete parts for this application are required in a variety of diameters and connecting angles and in a range of vertical inclines. However, there are solutions that are worth a closer look. DOWNLOAD ARTICLE![]() |
Job site report
BP 4373 Year 2011 Country Czech Republic Machine P 715 SE, RV 10 |
|
![]() |
||
The Lainzer Tunnel is a railway tunnel in Vienna that is 12.8 km long and, from December 2012, will connect the Westbahn (western railway) with the Südbahn (southern railway) and the Donauländebahn railway. The purpose of this plan is to increase the capacity of the eastwest transit system.DOWNLOAD ARTICLE ![]() |
Job site report
TS 4375 Year 2011 Country Austria Machine BSA 2109 D, BSA 1409 D |
|
![]() |
||
A slab track is being laid in the tunnel section with two individual six km tunnels. The sleepers are embedded in concrete and can absorb the vibration caused by high-speed trains in a better way due to having an extremely flexible insert. Maximum precision is required when the tracks are installed. The sleeper shoes that have been freshly embedded in the concrete must not be subjected to vibration. Even the slightest variations in the alignment of the tracks can result in the railway no longer complying with the original designs for high-speed travel.DOWNLOAD ARTICLE ![]() |
Job site report
TS 4357 Year 2010 Country Sweden Machine BSA |
|
![]() |
||
In Myanmar (Burma), work on the Yeywa hydroelectric power station, one of the lrgest in the country, is making good progress A PM stationary boom, several concrete pumps and a Telebelt telescopic band conveyor are valued partners on the construction site.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4157 Year 2009 Country Myanmar Machine Telebelt, MX 32, M 38, BSA 2109 HD |
|
![]() |
||
In Saxony-Anhalt on the outskirts of Lochau, the road bridge over the White Elster river is being completely renewed. It will replace a pretensioned concrete construction from the days of the DDR ad will guarantee the connection to Merseburg on the L 183 highway.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4158 Year 2009 Country Germany Machine M 24-4, M 52-5 |
|
![]() |
||
For seamless production of a 40 x 90 m underwater concrete base plate, the largest truck-mounted concrete pump in Austria, a Putzmeister BSF 63-5.20 H owned by Asamer & Hufnagl (Ohlsdorf, Upper Austria), delivered 3,300 m³ of conrete without interruption. Divers assisted et the job which took two days.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4159 Year 2009 Country Austria Machine M 63-5 |
|
![]() |
||
In South Africa the 2010 fottball World Cup has had a considerable impact on the expansion of the rail network. Alongside other projects, priority is being given to the fast completion of the Gautrain, an 80 km rapid train link. Two Putzmeister concrete pumps and a stationary boom are used in the production of numerous major prefabricated concrete elements.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4160 Year 2009 Country South Africa Machine BSA 1409 D, MX 24 |
|
![]() |
||
Sophisticated bridge structues can also be built with realtively little efort using concrete pumps and concrete distribution macines. The best example of this is the Hacka viaduct in the Czech Republic, which was handed over to the clients at the end of June 2007 after only two years of construction work.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4161 Year 2009 Country Czech Republic Machine BSA 1407 D |
|
![]() |
||
Small-scale construction machinery has authorised access even on the largest of consruction sites. For even where ground conditions are difficult, they are mobile, easily repositioned and up and running in a short space of time. This is demonstrated by this application report from south east Asia on a Putzmeister spray concrete pump.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4167 Year 2009 Country Thailand Machine P 715 TD |
|
![]() |
||
An impressive tunnel building project in Spain`s capital, Madrid, is to run the southern section of the heavily used M30 urban motorway under the earth`s surface. A number of Putzmeister pumps have been used here for placing concrete and for backfilling the tubbing with special mortar. Pumping distances of 600 m, high air humidity and harsh continuous operation were on the agenda at this mammoth construction site.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4166 Year 2009 Country Spain Machine KOV 1050, BSA 2109, M 42 |
|
![]() |
||
Increasing energy prices are making the costruction of gas liquefaction plants and high-volume liquid gas holders increasingly attractive. Putzmeister concrete pumps were already playing a decisive role in the completion of former LNG projects in Norway and Spain.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4165 Year 2009 Country Qatar Machine M 52-5 |
|
![]() |
||
The Strelasund bridge is Germany`s most spectacular bridge construction project - accounting for 2,381 m of the 4,100 m road link. The following article provides an insight into the concreting of the northern bridge superstructure.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4164 Year 2009 Country Germany Machine MX 24, BSF 36.16 H |
|
![]() |
||
Following the completion of the Three Gorges Dam and commissioning of the 5,000 m high railway to Tibet, China now has everyone talking about another spectacular construction project.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4173 Year 2009 Country China Machine BSA 14000 HP-D |
|
![]() |
||
In north-west Spain, two huge tanks for liquid natural gas (LNG) have been set up in the harbour of Mugardos on the Atlantic coast. Six of the largest truck-mounted concrete pump in Spain were onsite to concrete the outer shell. With vertical reaches of up to nearly 63 m the 4, 5 and 6-arm Putzmeister concrete placing booms towered high over the cupola area.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4175 Year 2009 Country Spain Machine M 33-4, M 36-4, M 46-5, M 58-4, M 58-5, M 62-6, M 63-5, RV 10 |
|
![]() |
||
The city of Prague is investing large sums of money in the expansion of its infrastructure. The current major projects include the extension of an underground railway line in the north-east of the city. Stationary Putmzeister pumps are being used for the long-distance concrete delivery here.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4176 Year 2009 Country Czech Republic Machine BSA 1405 E, BSA 1408 E |
|
![]() |
||
The Elbe-Lübeck canal (ELK) is a 67 km long federal waterway and a major means of transport between the Baltic and the network of European inland waterways. It is also becoming increasingly important for the navigation of sports boats. As the structural safety of the locks along the length of the canal can no longer be sufficiently guaranteed , e.g. in Lauenburg, the most westerly of the total of seven ELK locks, is to be replaced with a new one. The joint suppliers for the replacement of the Lauenburg lock (Wunder Kiestransporte GmbH & Co. KG and neuland beton H. Burgis KG [GmbH & Co.]) have been commissioned by ARGE, the successful bidder, with the concrete production, installation of pump lines and the concrete delivery – a technically time-consuming and costly task over a distance of almost 700 m. Two sound-proofed Putzmeister BSA stationary pumps and a modern M 52 long reach boom truck-mounted concrete pump from Pump Service betonlift Hamburg will be handling the concrete delivery and placement process. Complex measures for safe cleaning operations of the delivery lines and the concrete pumps are seen as exemplary for similar projects. DOWNLOAD ARTICLE ![]() |
Job site report
BP 3584 Year 2009 Country Germany Machine BSF 52.20 H, BSA 2109 D |
|
![]() |
||
Concreting in a nuclear power station is always something special: a maximum degree of reliability is expected of the machines and engineers, compliance with safety regulations is constantly supervised and as a rule cameras must remain outside. We were also able to observe this while working in Biblis nuclear power station.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4177 Year 2009 Country Germany Machine BSF 36.16 HLS |
|
![]() |
||
The 2nd Strelasund crossing is currently being built as part of the feeder road Stralsund/Rügen to the federal trunk road B 96 n using PM truck-mounted concrete pumps on land and water. After its completion this popular holiday island will be connected via a second bridge with the federal trunk road network on the mainland. Not only holiday traffic, but also the Baltic Sea ferry port of Sassnitz/Mukran will profit from this.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4178 Year 2009 Country Germany Machine M 31-5, M 32-4, M 36-4 |
|
![]() |
||
On the construction sections of the 57 km Gotthard Base Tunnel, numerous concrete spray systems are being used all day, every day by the Sika-Putzmeister alliance. On the middle section of the Sedrun projet, the tunnel builders are working under extremely difficult conditions with four Sika-Putzmeister type 500 wet spray units.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4179 Year 2009 Country Switzerland Machine Sika-PM 500, Aliva-500 |
|
![]() |
||
Since German reunification and after the opening of the Eastern European markets, the economic importance of inland waterways - and in particular the Elbe-Seitenkanal - has been increasing continuously and will continue to increase in the future. The construction of a new second lock will significantly improve the situation here for the transport of goods over the next few years. Not only the preliminary foundation work required for the Uelzen II lock, but also the bulky components with their different and at times contrary concrete requirements make high demands of planners, site workers, concrete pumps and their operators.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4180 Year 2009 Country Germany Machine M 42, BSF 52.16 H |
|
![]() |
||
Plans for the construction of a railway line in western China to Tibet were supported by Chinese politicians like Mao Ze Dong and Chou En Lai as early as 40 years ago. Since then the first segment of the Qinghai-Tibet railway line, 846 km long between Xining and Golmud (constructed 1958 - 1979), has been in operation for a long time. Further construction on the mammoth project was repeatedly interrupted during the 60s and 70s due to railway worker health problems, technical problems caused by permafrost and financial constraints. Construction of the remaining stretch of line, between Golmud and Lhasa, has now been resumed from both ends since June of 2001. Since more than 85 % of the route lies within an altitude range of between 4,000 and almost 5,100 m, the hardships imposed on men and machines are unbelievable. Even a PM truck-mounted concrete pump, type BSF 36.09, is keeping pace at heights of 5,000 m.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4181 Year 2009 Country China Machine BSF 36.09 |
|
![]() |
||
To improve safety in the 2.3 km long Heslacher Tunnel, a pedestrian escape gallery paralel to the two-track tunnel has been under construction since January 2005. Due to the small cross section, an unconventional solution is required forconcreting work.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4174 Year 2009 Country Germany Machine BSA 1005-D GRF |
|
![]() |
||
Currently under construction in Japan is the so-called Second Tomei Expressway, urgently needed to deal with the high volume of traffic between Tokio and Nagoya. The new motorway will take some of the pressure off the present Tomei Expressway which connects the two cities. The new motorway project also involves the consruction of an 820 m long motorway bridge to span the Yahagigawa River - a task which is worth several entries in the Guinness Book of Records! The most interesting aspect of the work is the methods of placing and distributing enormous quantities of mostly high-strength concrete into the piers of the bridge and on to the formwork for the road surface using stationary and mobile PM concrete pump units.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4182 Year 2009 Country Japan Machine BSF 36.15 H, BSF 52.15 H, BSS 52.15 H, MOLI BSF 2107 HP, BSA 2110 HP-D, RV 10 |
|
![]() |
||
Taiwan`s new High Speed Line connects the region around the capital city of Taipeh in the north to the sea port Kaohsiung in the south. The work on the mammoth project of the Taiwan High Speed Rail Corporation (THSRC) is estimated to cost approximately 16 billion Euro and work already cmmenced on it in March 2000 after the first construction jobs were awarded (contract value of up to 600 million Euro). The two-track high speed line leads through the extremely densely populated coast plain in the west of the island and passes through hilly terrain in the north.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4226 Year 2009 Country China Machine BSA 1407 E, BSA 1408 E, RV 16, RV 22 |
|
![]() |
||
Something which the Italian Alpie region around the mall town of Bormio does not lack are rain and snow, which can sometimes be quite heavy. Precipitation in the dams San Giacoo and Cancano "I" and the melt from the neighbouring glacier are collected by the power company AZIENDA ENERGETICA MUNICIPALE DI MILANA (AEM) and used to generate electricity in the power stations at Fraele, Premadio and Braulio. Other hydro-power stations also provide the region and its industries with electricity.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4183 Year 2009 Country Italy Machine M 36 |
|
![]() |
||
On a section of the Mediterranean Highway in the south of Spain, three Sika-PM500 P type concrete shotcrete spraying devices were being employed in backing up advance work in each of the three twin-boretunnels (toal length 5.04 km) along the total stretch of 9 km.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4184 Year 2009 Country Spain Machine Sika PM500 P, BSA 1005 |
|
![]() |
||
The project of the construction of a gigantic hydro-electric power plant involved the use of machines under the Sika/Putzmeister alliance and Sika concrete additives in both the construction of the 193 m high Kárahnjúkar embankment dam and for shotcrete work in the numerous galleries and the two gigantic underground chambers. Vatnajökull Glacier in the north east of Iceland, an area which can only be accessed under great difficulty. In the winter months - and here that means rom October to May- the journey from the nearest town Egilsstadir (around 50 to 100 km from the individual contract sections) and from the camps to the individual construction sections is frequently interrupted by blizzards. Then access routes are impassable for hours, and sometimes even days. And these are the months when the temperature can drop to -15 °C.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4185 Year 2009 Country Iceland Machine Wetkret WKM 103, Sika-PM400 P, BSF 36.14 H |
|
![]() |
||
A modern lock chamber is being planned for the Teltow Canal south of Berlin which on completion will replace a considerably smaller chamber which has been in opeation for almost 65 yars. A new lock bridge is currently under construction as a preparatory measure for this construction project. The necessary and extensive concrete works are being carried out by BERGER BETON GmbH using PM truck-mounted concrete pumps.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4186 Year 2009 Country Germany Machine BSF 36.16 H, BSF 42.16 H, BSF 52.20 H |
|
![]() |
||
Work is progressing well on the “Road Project German Unity No. 8” between Nuremberg and Munich. The project involves an extension of the express rail connection (ABS) from Munich to Ingolstadt (82 km) as well as the 89 km Intercity express route (NBS) from Nuremberg to Ingolstadt. On the 15.6 km long contract section Centre, up to 11 stationary Putzmeister BSA concrete pumps are simultaneously in operation.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4188 Year 2009 Country Germany Machine BSA 1408 E, BSA 1005 D |
|
![]() |
||
The most important section of the Hornberg by-pass was under construction in the form of a dual-lane highway tunnel almost two kilometers in length. The relocation of the B 33 main road was part of the project and as a traffic calming measure made a considerable contribution to the Black Forest community. Two PM truck-mounted concrete pumps equipped with 24 meter booms that can be operated in tunnels were in use almost every day, after the tunnel excavation had been secured using a Putzmeister wet shotcrete machine.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4189 Year 2009 Country Germany Machine M 24-4 with „Multi-Z“ boom folding, WETKRET WKM 103 |
|
![]() |
||
The Elbe-Lübeck canal (ELK) is a 67 km long federal waterway and a major means of transport between the Baltic and the network of European inland waterways. As the structural safety of the locks along the length of the canal was no longer sufficiently guaranteed, e.g. in Lauenburg, the most westerly of the total of seven ELK locks, had to be replaced with a new one. The joint suppliers for the replacement of the Lauenburg lock (Wunder Kiestransporte GmbH & Co. KG and neuland beton H. Burgis KG [GmbH & Co.]) had been commissioned by ARGE, the successful bidder, with the concrete production, installation of pump lines and the concrete delivery – a technically time-consuming and costly task over a distance of almost 700 m. Two soundproofed Putzmeister BSA stationarypumps and a modern M 52 long reach boom truck- ounted concrete pump from the pump service betonlift Hamburg were handling the concrete delivery and placement process. Complex measures for safe cleaning operations of the elivery lines and the concrete pumps were seen as exemplary for similar projects.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4190 Year 2009 Country Germany Machine M 52 , BSA 2109 D , BSF 52.20 H |
|
![]() |
||
On Slovenia’s largest construction, the Crni Kal Viaduct, Putzmeister concrete pumps had been used to place concrete in the eleven piers and for the high-rise and longdistance concrete delivery for the pour of two roadways using a cantilever method of construction.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4191 Year 2009 Country Slovenia Machine Truck-mounted concrete pumps BSF 28.09 and 36.09 , PM stationary pump BSA 2109 D |
|
![]() |
||
In the most north-eastern part of the Rhineland-Palatinate, a 378 m long tunnel was built in Betzdorf (construction time 02/2004 – 05/2006). It noticeably reduces the amount of through traffic in the town. The large tunnel cross-section at the south portal was unusually large but as work progresses it became smaller. To secure the excavation and to stabilise the working face, the working group was using a concrete wet spraying device type Sika®-PM500 P.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4187 Year 2009 Country Germany Machine Sika-PM500 P |
|
![]() |
||
Whilst old conveying rigs in Norway were being dismounted on the open sea and scrapped on land, engineers had been developing new techniques to win crude oil and natural gas under water. On the island of Melkoya, to the north of the polar circle, Putzmeister pumps have concreted a high-tech plant to liquefy gas as well as the power station there too. DOWNLOAD ARTICLE ![]() |
Job site report
BP 4192 Year 2009 Country Norway Machine BSA 1005, Pumi, M 32, M 36 |
|
![]() |
||
To relieve the historic heart of the town, the German Federal State of Baden-Württemberg was having an approximately 400 m long road tunnel driven in the community of Beuren costing roughly 15 million Euro. The shotcrete work had been carried out by the building contractor Bilfinger Berger AG using a Putzmeister WETKRET WKM 133.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4223 Year 2009 Country Germany Machine Wetkret WKM 133, Sika PM 500 PC |
|
![]() |
||
By means of well-considered planning and largely automated production, one Belgian manufacturer of prefabricated concrete parts has been able to rationalise and expand production. Important roles are played here by a small concrete pump, a hydraulic transfer tube and a mechanical concrete distributor.DOWNLOAD ARTICLE ![]() |
Site report
BP 4067 Year 2008 Country Belgium Machine BSA 1005 |
|
![]() |
||
At five o'clock on Sunday afternoon, two and a half days of continual concreting came to an end for five Putzmeister "hall master" M 31-5 truck-mounted concrete pumps in Hamburg. Shortly beforehand, the last section of the base plate of 6,600 m3 concrete with an unusually high steel fibre content of 75 kg/m3 was completed. This thick and hard-topump concrete was delivered without interruption into the base of PETRA III, a new experimental building used by the German Electron Synchrotron (DESY).DOWNLOAD ARTICLE ![]() |
Site report
BP 4068 Year 2008 Country Germany Machine M 31-5 |
|
![]() |
||
The construction of dams for the safe supply of water to the population and for agriculture is a tradition in many countries. In Ethiopia, where water supplies are relatively plentiful, the construction of simple dams and surround of small lakes has been carried out by the state authorities since 1895. However, the dams constructed must be solid and a large quantity of concrete is required to ensure that large reserves of water accumulate. In view of the large quantities of material required, it is easy to understand that the building materials used must be as inexpensive as possible and also adapted to the conditions. This means that less cement (also to minimise the build-up of hydration heat) and only a low proportion of sand and fine aggregate must be used – but with a considerable amount of oversized grain. As concrete pumps are not suitable for these extremely lean mixes, Putzmeister offers an alternative delivery system as part of its range.DOWNLOAD ARTICLE ![]() |
Site report
BP 4100 Year 2008 Country Ethiopia Machine TELEBELT® TB 110 |
|
![]() |
||
Vorarlberger Illwerke AG is significantly expanding its capacities for the European electricity market through the construction of the pumped storage power station, Kops II, which has a turbine output of 450 MW. During the construction the cavern cavity, the extensive concrete work in the enormous machine chamber is performed with just one stationary concrete boom, which is operated alternatively on two tubular columns. Work is carried out around the clock in a 3 shift operation. The construction costs for the cavern power station and the underwater systems are estimated at approx. 30 million €. The work on Kopswerk II started in September 2004 and the start up operation is planned for 2008.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4163 Year 2008 Country Austria Machine BSA 1408 E, MX 28-4 |
|
![]() |
||
Ed. Züblin AG has erected an imposing high-rise project, the OpernTurm, in the centre of Frankfurt am Main at a breathtaking speed. Including its base plate, around 55,000 m3 of concrete had been placed in the 170 m tower.DOWNLOAD ARTICLE ![]() |
Job site report
BP 4380 Year 2008 Country Germany Machine MX 32-4, BSA 2109 HD |
|
![]() |
||
With several Putzmeister high performance concrete pumps, a sophisticated delivery line system, nonballasted stationary booms and demanding concrete mixtures, the carcass of the Burj Dubai is currently under construction. The constructor, Emaar Properties (UAE), has commissioned a consortium managed by Samsung (Korea) together with BeSix (Belgium) and Arabtec (UAE) with carrying out the construction works on the prestigious high-rise project. Turner Construction (USA) is responsible for the project management. The building with a final hight of approx. 800 m, will be the highest building in the world. It has not only fascinated international experts since the start of construction (excavation in August 2004), but also a wide public.DOWNLOAD ARTICLE ![]() |
Site Report
3893 Year 2007 Country Dubai Machine BSA 14000 HP D |
|
![]() |
||
The Salzburger Gleitbau GmbH used an interesting method for the construction of the Brown Coal Power Station at Lippendorf to “pull up” the two staircase towers and the installation shafts at the same time. The concept made up of slip form shell, temporary bridge and separate concrete placing boom considerably reduces the amount of cranes, freight elevators and personnel. The stationary Putzmeister placing boom MXR 32 took over a “central role” here – in more than one meaning!DOWNLOAD ARTICLE ![]() |
Site Report
2606-1 Year 2007 Country Germany Machine MXR 32-4 T |
|
![]() |
||
The on-going energy development of Hydro-Québec is part of a $ 2 billion project undertaken by SEBJ – Societe Energie de Baie James. For Hydro-Québec, SEBJ has been instrumental in the development of a very rich hydroelectric area via numerous power stations installed since the 1970s. The new Eastmain-1 hydroelectric power plant – located on the Eastmain River near James Bay – is designed to generate 480 MW of electric power for Hydro-Québec. This was preceded by extensive negotiations with the Cree Indian clans resident in the region. Several different Putzmeister machines are being used here in the Canadian wilderness – far from any service support point.DOWNLOAD ARTICLE ![]() |
Site report
BP 3780 Year 2006 Country Canada Machine Telebelt, Dynajet, MX 30-4, MX 24-4, BSA 2109 HD |
|
![]() |
||
After years of stagnation in the construction market, finally since 2003/2004 Thailand sees a strong recovery in the private sector with new projects and the completion of some of the over 300 unfinished and abandoned buildings in Bangkok Metropolis. Despite the improving economy, an investment in new construction equipment is still regarded with reserve. Therefore, a wide range of reliable used Putzmeister concrete pumps is the key to success for construction companies.DOWNLOAD ARTICLE ![]() |
Site report
BP 3595 Year 2004 Country Thailand Machine BSA 2110 HD |
|
![]() |
||
Since mid-2001, the Hungarian government has made the expansion of infrastructure its top priority. By the end of 2006, the country`s motorway network will have almost doubled in length, from 700 km to around 1,200 km. Among the key projects is the completion of the M7 motorway from Budapest to Croaian border, which will cross central Europe`s longest prestressed concrete bridge. Built by Hungarian construction company Hídépítö - a member of the French Vincigroup - this bridge will span the valley at Köröshegy near Lake Balaton. The 16 to 80 metre long pillars, which are cast in five metre sections, and the superstructure sections with spans of up to 120 m are being constructed by a team of over 300 people working in shifts seven days a week.DOWNLOAD ARTICLE ![]() |
Job site report
BP 3912 Year 2004 Country Hungary Machine MXR 28-4, BSA 1409 D |
|
![]() |
||
The main island of Singapore is about 42 kilometres from east to west and 23 kilometres from north to south. The MRT system (Mass Rapid Transit System) now covers 48 stations (stretching over 83 km) and three depots. The extension of the line network concerns both the North East Line and the Changi Airport line. 90 % of the 40 km long North East Line with 16 stations passes through tunnels.On completion, this line will connect the business centre in the South of Singapore around the World Trade centre to the residential areas of Hougang, Sengkang and Punggol, new towns in the North East of the densely populated Island Republic. DOWNLOAD ARTICLE![]() |
Site Report
3293-1 Year 2002 Country Singapore Machine BSA 2110 HP-D |
|
![]() |
||
With an investment volume of approximately 133 million €, the Water Supply Works of Barcelona are having their new Administration Building “Torre Abgar” built. The building of the high-rise tower is at present the most spectacular construction project in the City. It is scheduled to be completed by the end of 2003. With its 35 storeys above ground and four below ground, this sophisticated office construction will then have reached a height of 142 m. The general contractor warded the contract is DRAGADOS Y CONSTRUCCIONES. The Pump Service CABALLER, as subcontractor, is making the complete infrastructure available for the conveying and placing of the concrete.DOWNLOAD ARTICLE ![]() |
Site Report
3515-1 Year 2002 Country Spain Maschine BSA 2110 H-D and MX 28-Z |
|
![]() |
||
The economical growth in and around Shanghai which is a pulsating trade centre in China is continuing to expand. The new finance centre, Pudong, is being built in its own urban district and on completion it will consist of dozens of office skyscrapers. The 421 m high JIN JAO BUILDING is also one of these skyscrapers which are now almost complete after just a short construction time. Putzmeister pumps took over the conveying of the total of 280,000 m³ concrete up to a height of 382 m.DOWNLOAD ARTICLE ![]() |
Site report
BP 2707 Year 2002 Country China Machine BSA 14000 |
|
![]() |
||
The new ICE high-speed railway line between Frankfurt and Cologne requires the construction of numerous tunnels and bridges. The crossing of the River Lahn is one of the most spectacular bridge projects ever. Stationary Putzmeister placing booms are at the fore here for the work on the bridge superstructure – almost 50 m above the Lahn Valley.DOWNLOAD ARTICLE ![]() |
Job site Report
MT 3214 Year 2000 Country Germany Machine MXR 24, MXR 32 |
|
![]() |
||
Two of the worlds’ most powerful concrete pumps together with distribution booms and unique climbing equipment played a major role in the construction of the EmiratesTowers in Dubai / UAE. Dubai's twin Emirates Towers, one of which is the tallest building in the Middle East and Europe and the 10th tallest in the world, have been topped out a remarkable six months ahead of schedule. The office block soars 350 metres, while its sister tower is the world's third tallest hotel, at 305 metres. This spectacular pair of triangular shaped sky-scrapers are the third tallest set of towers on the planet. DOWNLOAD ARTICLE![]() |
Site Report
3086-1 Year 1998 Country UAE Machine MXR 32-4 T |
|
![]() |
||
In a record time of just 8 months a 50-storey office tower 202 m high was built at the Handelskai (‘Commercial Wharf’) in Vienna. In order to finish the carcass of this millennial construction on time it was necessary not only to use the very latest formwork techniques combined with pumped concrete but also to place the concrete using a modern concrete placing boom. DOWNLOAD ARTICLE![]() |
Site Report
2998-1 Year 1998 Country Austria Machine BSA 2110 H-E and MXR 28 T |
|
![]() |
||
Øresund-Tunnel construction site relies on complete service and equipment from Putzmeister when it comes to concretingDOWNLOAD ARTICLE ![]() |
Site report
TS 2595 Year 1998 Country Denmark Machine BSA 2109 HD, BSA 2110 HE, JT 10000, BRF 43.12 |
|
![]() |
||
To improve the supply of drinking water for the 18 million inhabitants of New York, an approximately 100 km (62 mile) long drinking water gallery system is being built at present 165 m (550 ft) below the city. The management of works used 2 long-stroke Putzmeister concrete pumps of the BSA 2110 HD-E series on one section to concrete the tunnel formwork. In addition two large Putzmeister Jumbo concrete mixer troughs have been installed. These served as in-line mixers and “buffer” for the concrete that is supplied batchwise and this makes continuous placing of concrete possible in a 3-shift operation, 5 days a week, “nonstop”. DOWNLOAD ARTICLE![]() |
Site Report
2788-3 Year 1997 Country USA Machine BSA 2110 HD-E |
|
![]() |
||
The previous world record in longdistance concrete conveying has been beaten by 195 m by a Putzmeister concrete pump of type BSA 14000 HP-D - the new record is 2015 m! This new best performance was set up by the French concrete pump service TRANSBETON whilst carrying out refurbishing work in an hydraulic water gallery in Haut Doubs at Le Refrain construction site near the Swiss border.DOWNLOAD ARTICLE ![]() |
Site Report
2476-2 Year 1997 Country 1997 Machine BSA 14000 HP-D and BSA 2109 HP-D |
|
![]() |
||
RIVA DEL GARDA power station - 2nd June 1994: The pumped storage power station built in 1929 at Riva del Garda has an output of 76 MW and is fitted with three turbines and a water pump for filling the night-time storage located further up the mountain with water from Lake Garda.DOWNLOAD ARTICLE ![]() |
Site Report
TS 1962 Year 1994 Country Italy Machine BSA 2100 HE |
|
![]() |
||
100.000 cubic yards of concrete pumped through the first 52 metre boon – in three months – trouble free! This is the report from “Minenergo” – the Soviet Ministry for Power Plant Construction. In total, approx. 400.000 cubic yards were pumped to protect the damaged reactor block 4. Now along with its records for longest distance and highest elevation, Putzmeister may have established another record for volume pumping. DOWNLOAD ARTICLE ![]() |
Site Report
BP 1148 Year 1986 Country Russia Machine BP 52-4 |
|
![]() |
||
A successful working family of shotcreting machines for the wet-mix-process - well proven on the "High Speed Railways Lines: Hanover/Würzburg and Mannheim/Stuttgart"DOWNLOAD ARTICLE ![]() |
Site report
TS 1001 Year 1986 Country Germany Machine Shotcrete Buffaloe |
|
![]() |
||
With 432 m pumping height the old Putzmeister world record of 340 m set in 1978 in the Gotthard Tunnel was exceeded by nearly 100 m. In the meantime Putzmeister concrete pumps have achieved over 300 m at several sites. The machine technique first applied in 1977 during Frankfurt world record has proven itself again and again. Lon stroke pumps with the largest possible stroke volume have proven to be very reliable and economical. Fewer piston change-overs at 80-100 bar delivery pressure reduce the wear on all parts, especially on delivery line fixtures. Up to now Putzmeisters’ highest achievements have not yet been beaten.DOWNLOAD ARTICLE ![]() |
Site Report
BP 969 Year 1985 Country Spain Machine BSA 2105 D |
|
![]() |
||
The longest bridge to be constructed by the "launching method" built out of concrete (grading curve A) pumped by a PM-Elephant pump.DOWNLOAD ARTICLE ![]() |
Site Report
797 Year 1982 Country Germany Machine M 25 |
|
![]() |
||
In 1980 a pumped storage power station was built near Rodez in the French Massif Central. Two pressure shafts each with 5.3 m Ø and 41 % incline were to be concreted. A Putzmeister Elephant Pump BRA 1403 HE was used to pump to a height of 300 m. For logistic reasons the remaining 60 m were conveyed from the top by fall delivery. DOWNLOAD ARTICLE![]() |
Site report
BP 0931 Year 1980 Country France Machine BRA 1403 HE |
|
![]() |
||
One decisive measure of a concrete pump is its ability to meet the demands of high-rise concrete placing, an exemplary demonstration of which was given by a PUTZMEISTER Elephant concrete pump when it wellsurpassed all existing records at the Post Office Tower in Frankfurt. The performance given by the PM Elephant trunk transfer tube and superior oil-hydraulic system has now convinced the few remaining sceptics of the extraordinary capabilities of these pumps.DOWNLOAD ARTICLE ![]() |
Site Report
BP 365 Year 1977 Country Germany Machine BRS 2104 E |